10.5' x 32' Triple Pass complete system - with 24MM BTU Jackson Burner with:
- Approx. 8 tons/hr. of Dryed material.
- 24,000,000 BTU Jackson Gaz Burner.
- (2) System of Dust Collection.
- 200 HP. Motor(440v).
- Still assemble so will need to be dismantle.
NOTE:
- It was installed but was never put in operation.
- Components appear unused in production